4-68.
4-69.
4-70.
When the annual security
survey is conducted, it
should begin at which of the
following areas?
1.
Roof
2.
Basement
3.
Perimeter
4.
Top floor
When surveying the perimeter
of the facility, the AIS
technical manager need NOT
check which of the following
accessways?
1.
Fire escapes
2.
Doors and windows
3.
Other entrances, such as
vents
4.
Manned posts at the
property line
When surveying the internal
security of a facility, the
AIS technical manager should
follow which of the
following guidelines?
1.
Begin the survey on the
roof
2.
Determine where alarms
annunciate
3.
Finish the survey in the
mailroom area
4.
Note the volume of the
alarms
IN ANSWERING QUESTION 4-71, REFER
TO TABLE 4-6 IN THE TEXT.
4-71.
Which of the following
questions need NOT be
included in the physical
security survey?
4-72.
Which of the following facts
are used by the AIS
technical manager to
evaluate existing access
controls and protection
measures?
1.
The schedule of alarm
tests
2.
The design of the alarm
system
3.
The number and location
of manned posts
4.
The distance between the
manned posts and the
building
4-73.
Which of the following items
are prepared and executed
for the accomplishment of
the commands specific
mission?
1.
Operation plans only
2.
Operation plans and-the
commands organizational
manual
3.
Emergency response plans
only
4.
Emergency response plans
and the commands
organizational manual
4-74.
A total of how many
different types of
contingency plans make up a
COOP security plan?
1.
One
2.
Two
3.
Three
4.
Four
1.
2.
3.
4.
Is the present equipment
up-to-date?
Is the alarm system
inspected and tested
occasionally to ensure
operation?
What kind of sound does
the alarm make?
How many zones of
protection are within
the protected building?
40