to other people or events or in any other way cultivating
an air of mystery or superiority. It goes without saying
the use of good human relations techniques is essential
to a successful interview. Nothing can be gained by
being belligerent and antagonizing the interviewee.
Your conduct should be firm and inquisitive, but also
calm, sincere, and open. Probe in some detail any
answer that appears evasive or defensive.
Taking notes is a matter of individual preference.
Some people take very adequate notes at listening
speed. Others must devote all their attention to
listening. If note taking is a problem, the interview
could be conducted by two-person teams. Another
alternative is to use a portable tape recorder, making
certain the interviewee knows in advance that the
interview is being taped. If a two-person team or a tape
recorder is not available, attempt to listen and absorb as
much as possible, then record notes and impressions
directly after the conclusion of the interview.
The evaluation tests can be scheduled or come as a
surprise. Most security inspections include testing the
emergency, fire, evacuation, and disaster recovery
activities. Access controls should also be tested on a
no-notice basis. Tests are best scheduled or conducted
early in the inspection rather than after everyone is
alerted to the presence of the inspection team. Special
concern, guidance, and instructions must be taken into
consideration when the AIS facility has armed guards.
It is possible to test the adequacy of programmed
controls and data authorization by submitting jobs that
attempt to bypass these controls. Take care not to
destroy live data. However, if AIS upper management
believes error detection and correction controls really
work, then there should be no objection to the
introduction of deliberate errors to test these controls.
The inspection team should convene periodically,
preferably at the end of each days activity, to review
progress and to compare notes. Areas of weakness or
concern should be highlighted, and additional tests or
interviews scheduled to investigate further any
particular areas of concern. Copies of the inspection
working paper should be classified, numbered, dated,
and organized for ease of understanding, review, and
comparison.
At the completion of the inspection, a written report
is to be prepared immediately, while impressions are
still fresh. As a rule, the inspection report includes:
An executive summary;
A description of the inspectiondates
locations, scope, objectives, and so forth;
A detailed report of observations made;
Conclusions drawn from the observations; and
Recommendations for corrective actions, as
appropriate.
The degree of cooperation received should be noted and
favorable conclusions should be given the same
prominence as deficiencies. Tables, charts, and
matrices of results, statistical tests, and conclusions may
be very helpful. Distribute the final report to the AIS
facility and the command upper management as
prescribed in the planning phase.
INSPECTION FOLLOW-UP
An inspection is of little use unless it is the basis for
improvement, correction, and management follow-up.
The responsibility for implementation of such activity
normally resides with the commanding officer (CO) of
the command. The CO must, in turn, assign
responsibilities for corrective action. The best
approach is to summarize each major deficiency on a
control sheet, outlining requirements, problem
definition, responsibility, action taken or required, and
follow-up action. In addition, an indication should be
made of the date that action should be completed, or if
it is to continue. Some of the corrective action may
require additional funds; this should be noted.
Corrective action, follow-up, and disposition of the
deficiencies should follow a recurring reporting cycle
to upper management. Quarterly reports are
recommended for any inspection control items still
open.
The final step is a frank and honest evaluation of
the inspection itself by AIS facility management and the
inspection team. A group discussion should be held
with the expressed purpose of improving future
inspection procedures and processes. The inspection
plan may need to be amended or the team composition
may need to be changed. The emphasis of the
inspection should always be positiveone of helping
AIS management at all levels to improve the security
and control of the AIS facility.
DATA PRIVACY
The Privacy Act of 1974 (Public Law 93-579)
imposes numerous requirements upon naval commands
to prevent the misuse or compromise of data concerning
individuals. Navy AIS facilities that process personal
data must provide a reasonable degree of protection
against unauthorized disclosure, destruction, or
4-33