1-19.
A scheduler does NOT perform
which of the following
tasks?
1.
Review AIS requests
2.
Prepare schedules
3.
Operate the computer to
run production jobs
4.
Organize data processing
priorities for both
-
scheduled and
unscheduled work
1-20.
What method should you use
to determine the accuracy of
your schedules?
1.
Monitor the jobs
2.
Review production
results
3.
Supervise computer
operations
4.
Review job control logs
1-21.
To determine how to go about
scheduling work on your
facilitys computer system,
you should depend on which
of the following factors?
1.
The number of jobs to be
scheduled
2.
The system configuration
only
3.
The operating mode of
the system only
4.
The system configuration
and operating mode
1-22.
Which of the following is
NOT an example of a computer
operating mode?
1.
Prime-time
2.
Real-time
3.
Online
4.
Batch
1-23.
1-24.
1-25.
As scheduler, you will be
concerned with precomputer
processing for which of the
following reasons?
1.
To see that the work is
performed accurately
2.
To see that sufficient
magnetic media are
available to store the
data
3.
To ensure that all
inputs are received on
time according to
prearranged schedules
4.
To ensure users are
complying with standard
operating procedures
If you schedule so much work
for the computer that you
overload the computer
system, which of the
following results is likely
to occur?
1.
AIS services are
underutilized
2.
User service
deteriorates
3.
Precomputer processing
service deteriorates
4.
Each of the above
As a scheduler, which of the
following factors must you
know about the files in use?
1.
Where to find them in
the magnetic media
library
2.
Where to store them in
the magnetic media
library
3.
The record sizes and
blocking factors of each
file
4.
How to reconstruct them